You are welcome to download a copy of our Net Metering Interconnection policy. 

CLICK ON IMAGE TO DOWNLOAD

CLICK HERE TO DOWNLOAD (Net Metering Policy)

The 2010 payment referenced in section 5 is $0.02735 per Kwh and the modification cost referenced in section 6 is currently set at $250.

If you have any questions please contact our Engineering Manager, Lloyd Sisson - phone (307)245-3261 